| Project | Nature of Job | Consultant | Main Contractor |
|---|
| World Bank Group Office Building, Burkina Faso | Supply of Structural & Secondary Steel Works | Bureau d’ Architecture et de Design | VENCO IMTIAZ Contruction CO |
| Lusail Plaza Tower, Doha, Qatar | Fabrication & supply of Galvanized Frames | Dar Al Handasah | M/s Hyundai Engineering & Construction M/S Nova Composites |
| BB05 District Cooling Plant | Misc. Metal Works | AG Engineering | Art Line Cont. |
| Aweer Power Station ‘H’ Phase IV | Structural Works | ECG | The Second Const. Co. Ltd China Const. Third Eng. Bureau |
| Hydro Power Plant at Cameroon | Structural Steel Platform & Handrails | GBN | Groupement d’Interet Economique (GIE) |
| Deira Water Front | Structural Steel Platform | Beaver Gulf | X’s Platform |
| Reem Mall Abu Dhabi | Structural Steel Platform | WME Consultants | X’s Platform |
| Refurbishment work for Office and Horse Stable at Fujairah | Fabrication, supply and installation of steel structure and sandwich panel | Capital Consultancy | Bombay Contracting LLC |
| FP 2046000024 – Construction of Store Building at Lehbab Conservation | Fabrication, supply and installation of steel structure and sandwich panel | Engineer’s Office | Al Tariq Contracting LLC |
| P-001117000 – Steel Shed Car Park on Plot No. 6166760 at Nadd Al Shiba | Fabrication, supply and installation of steel structure and sandwich panel | Engineer’s Office | Al Tariq Contracting LLC |
| Containerized Living Quarter For Diego Garcia | Design, Supply and Fabrication of Staircase, Platform, Handrails and Roof Truss with Roof Sheets | CADG Engineering Pte Ltd | Specialist Services LLC |